Last Open-Walled Bathroom Update

I’m a little bored of taking pictures of wall studs. But I did want to document this process after all, and the drywaller is here today so this was my last chance to show the work we’ve been putting into this project up to this point.

First up, the doors, all framed! Here is a picture taken from right by our bedroom window. The closet door is on the right, the bathroom door is on the left:

Door Frames

This isn’t a load-bearing wall, so the big header boards (I believe they’re 4×6’s) are total overkill. But we just re-used them since they were in there originally.

Here’s the bathroom, looking in from the doorway:

Bathroom from the doorway

Sorry for the picture quality… early morning camera work. 🙂 The shower is on the right, the toilet goes under the window on the left, and the sink will be out of the shot on the left.  And Dave added insulation to all of the exposed exterior wall shortly after I took this. So at least this one little piece of wall will be warm in the winter, I guess?

And here’s the shower floor: (Oh man, so not exciting)

Shower Floor

If you’re feeling really enthusiastic, you can compare it to this picture, which was how it looked before we moved the drain and added the curb and plywood.

Moving along, here you can see a bit of PEX tubing peeping up from underneath the house before it switches over to copper for the shower water supply lines:

Shower Plumbing 1

And here’s the rest of the plumbing work for the shower:

Shower plumbing 2

It’s going to have a rainfall shower head, so the attachment point is extra high. Directly below that we have the diverter for the handheld shower, which will come out of the wall to the right side of the main valve. On a side note, if you get a new valve installed, make sure you install the cartridge and close the valve, otherwise your hot and cold water will mix and you won’t be able to get any hot water ANYWHERE IN THE HOUSE. The plumber came back first thing in the morning and fixed it when we called and said we didn’t have hot water. He was very sheepish and apologetic.

Okay, so turning around back towards to bathroom entrance, here we have the sink! Or at least, where the sink is going to go:

Sink Location

Wooo. Pretty much right after I took that picture Dave crawled up into the attic and ran the electrical wire for the vanity lights and boxes, in case you were wondering. He’s been a busy bee! Here’s a closer shot of the new plumbing:

Sink Plumbing

The new sink has two faucets and only one drain. The plumber was able to tie the new hot and cold lines into the ones that already go to the hallway bathroom sink on the other side of the wall. It looks like a crazy game of Pipe Dream, but hopefully it will all work correctly…

Unfortunately we weren’t able to tie the drain in with the existing drain for the hallway bath, so instead we were able to notch the studs and bring the old drain around the corner. yeah, that took awhile. Adventure! Or something.

It’s a “floating” sink, so we added some extra 2×4’s for blocking so all of our anchoring screws will be going into actual wood and not just drywall.

So that’s the state of things. The drywall is going up as I type this, and everything should get mudded and textured tomorrow. Hopefully we can start painting a day or two after that! We still need to buy a light fixture for the closet, but even without a light, once it’s painted we will have storage space again!!! Meanwhile, Dave will get to start on the final big project: tiling. Well actually first he gets to make a shower pan, so we will still be a single-shower household for a little while yet. Perhaps we could install the sink first?